A bathroom leaves less room for error than any other remodel in the house. Every square foot is committed to plumbing, ventilation, storage, or clearance, and the assemblies that keep water where it belongs are hidden when the tile goes in. Getting those right is the most important part of the job. Renew Construction remodels bathrooms throughout Utah County, including Lehi, Orem, Provo, and the surrounding communities.

We visit your home, discuss your goals and budget candidly, and provide a written estimate with real numbers rather than a teaser figure that grows once the work begins.

We finalize the scope, materials, and schedule, and we pull the permits. Cities like Lehi, Orem, and Provo each enforce their own requirements, and we navigate them on a regular basis.

A single project lead runs your job. They keep you informed, keep the site clean, and keep subcontractors on schedule.

You inspect every part of the project with us before we consider it complete.

Utah County has hard water, and the mineral content shortens the life of valves, shower heads, and glass enclosures faster than in other markets. We specify fixtures accordingly and recommend a softener loop when one is not already in place.

Ventilation matters more here than homeowners expect. A dry climate hides moisture problems until they become expensive, so we size exhaust fans above the code minimum when needed. We vent all bathrooms them through the roof, not into the attic.

Older housing stock in the central part of the county often has galvanized supply lines or cast iron drains that are close to the end of their service life. We will tell you during the estimate if we think replacement makes sense while the walls are already open, since doing it later costs much more.

Permitting also varies by city. Requirements in Lehi are not identical to Provo or Orem, and we handle those differences so you don’t have to.

Utah County Bathroom Remodel
How long does a bathroom remodel take?

A half bath update usually takes about 1 week. A full bath takes about 1.5 weeks. A full bath with tile will be around 2 to 3.5 weeks. Custom tile, special-order fixtures, and inspection scheduling could cause a project to take longer.

Will I be without a bathroom the whole time?

Only if it is your only bathroom. We stage the work to keep at least one bathroom functional whenever the house allows it, and we tell you upfront if that’s not possible.

Can I move the shower or toilet?

Yes. Relocating a toilet is the most expensive fixture to move because of the drain size and slope requirements. We will show you what the change costs before you commit to it.

Do you handle permits and inspections?

Yes. We work with your city to pull permits and schedule inspections.

Do you install tile showers or prefabricated showers/tubs?

Both. Tile gives you design flexibility and adds more value, while a quality acrylic unit installs faster and costs less. We will recommend one based on your budget and plumbing needs.

Are you licensed and insured?

Yes. Renew Construction is a licensed and insured general contractor in Utah.